Maintenance schedule (48 Cromwell Road)

Our maintenance plans for the next 6 months at 48 Cromwell are:

  • replace carpet on first floor landing steps
  • redecorate kitchen (paint walls and ceiling, general tidy up)
  • repaint ground-floor entrance hall
  • replace kitchen sink and adjacent worktop
  • replace broken kitchen floor tile
  • prune trees / shrubs

And for later in the summer:

  • exterior repairs (masonary / paintwork)
  • full tidy-up of garden

You must be logged in to post a comment.